Decisions to Resolve Before Curtain Installation

Before production, approve the system, dimensions, track, heading, opening direction, motor provision and installation scope for every opening—not only the fabric. Closing these decisions in one schedule prevents teams working from outdated drawings or incomplete samples.
01

Why it matters at project stage

A pre-production decision gate allows one coordinated review before changes carry greater time and cost implications. Visual and technical approvals should remain together under the same opening reference.

02

Information required

Confirm the approved fabric and colour code, final measurement and track centreline, heading and opening direction, motor and control method, installation programme and site readiness.

03

Reaching a project decision

Record product, quantity, direction, dimension and accessories for every opening. If the site or material changes, resubmit all affected decisions before production starts.

04

Coordination through delivery

The architect or interior designer, client and delivery teams should share the current approval set. Do not confirm delivery or installation until the mounting area, power points and ceiling finishes are ready.

Project checklist

Points to resolve in the project

  • Are the sample and product code approved?
  • Is the final measurement recorded?
  • Are track, heading and opening direction clear?
  • Is the power point ready?
  • Are installation access and date confirmed?