Professional project guide
Planning Curtain Production and Making
Release production only when the approved fabric code, final measurements, heading, draw direction and seam decisions are complete in one schedule. This connects material procurement, making and installation to the same revision.Why it matters at project stage
Fabric approval alone does not remove production risk if dimensions, pattern direction or heading remain unresolved. Identify every opening separately in the workroom schedule.
Information required
Confirm the final sample, opening and production dimensions, heading and fullness, draw direction, usable width, pattern repeat, seams, quantities and installation sequence.
Reaching a project decision
Calculate fabric quantities, usable width, pattern matching and necessary seams before making. If a substitute is needed, resubmit both technical and visual differences.
Coordination through delivery
The workroom, project and installation teams should use the same revision schedule. Label and package completed treatments against the site opening references.
Project checklist
Points to resolve in the project
- Is the sample final?
- Is the measurement schedule current?
- Are heading and direction approved?
- Are seams defined?
- Is installation sequence agreed?