Professional project guide

Coordinating Curtain Installation within a Project

Plan curtain installation when finishes and access are ready, with each product, track and opening reference verified. Sequence the work around ceilings, electrical connections, furniture and final cleaning to reduce damage and repeat visits.
01

Why it matters at project stage

Installing before the site is ready can soil fabric, set a track at the wrong level or leave a motor connection incomplete. Use a short pre-installation acceptance check.

02

Information required

Confirm substrate and pockets, opening and product codes, tested power points, safe access, completion of adjacent work, protection, installation order and site contacts.

03

Reaching a project decision

Sequence openings by actual readiness. Record incomplete infrastructure and do not force installation where the agreed conditions are absent.

04

Coordination through delivery

The site lead provides access and working space, the electrical team completes motor connections, and the curtain team installs tracks and textiles. Report completed and outstanding openings each day.

Project checklist

Points to resolve in the project

  • Are surfaces and pockets ready?
  • Do product and opening codes match?
  • Are power points tested?
  • Is access safe?
  • Are adjacent works complete?