Professional project guide

Power and Cabling for Motorised Curtains

The electrical team should plan power and cabling after the motor type and control arrangement are selected. Locate the supply on the motor side without obstructing the curtain pocket or service access, and verify the cable route before the ceiling is closed.
01

Why it matters at project stage

Early electrical coordination avoids exposed cables and inaccessible connections after the curtain installation. Define the motor side and supply method separately for every opening.

02

Information required

Confirm the motor model, manufacturer-stated supply, motor side, cable route, connection access, testing sequence and responsibility for electrical protection.

03

Reaching a project decision

Compare wired, low-voltage, PoE and rechargeable options only within the selected product’s documented capabilities. Cable sizing, protection and connection method remain part of the electrical design.

04

Coordination through delivery

The curtain specialist provides motor position and access requirements; the electrical or controls team designs the safe supply and control. Test the point, power and cable continuity before ceiling closure.

Project checklist

Points to resolve in the project

  • Is the motor model confirmed?
  • Is the supply verified in manufacturer data?
  • Is the motor side correct?
  • Can the connection be serviced?
  • Was the cable tested before ceiling closure?

Project consultation

Let’s review curtain, fabric and system decisions with your project team.

Discuss your project