Power and Cabling for Motorised Curtains
The electrical team should plan power and cabling after the motor type and control arrangement are selected. Locate the supply on the motor side without obstructing the curtain pocket or service access, and verify the cable route before the ceiling is closed.Why it matters at project stage
Early electrical coordination avoids exposed cables and inaccessible connections after the curtain installation. Define the motor side and supply method separately for every opening.
Motorised window treatments sit at the junction of the electrical, controls, ceiling and curtain packages. Resolving power, controls and access before finishes reduces later cable alterations, access panels and pocket revisions.
Information required
Confirm the motor model, manufacturer-stated supply, motor side, cable route, connection access, testing sequence and responsibility for electrical protection.
Select motor capacity, power arrangement and control compatibility from current manufacturer information. Pile Perde identifies the window-treatment requirements for coordination but does not design the electrical installation.
Reaching a project decision
Compare wired, low-voltage, PoE and rechargeable options only within the selected product’s documented capabilities. Cable sizing, protection and connection method remain part of the electrical design.
Use “Is the motor model confirmed” and “Is the supply verified in manufacturer data” as decision gates for this subject. Compare any viable alternatives against those two project-specific questions, then document why the selected approach answers them.
Coordination through delivery
The curtain specialist provides motor position and access requirements; the electrical or controls team designs the safe supply and control. Test the point, power and cable continuity before ceiling closure.
Issue the motor side, power point, cable route, control group and service access as one coordinated set. Recheck any site change before commissioning.
Before handover, resolve “Is the motor side correct” and “Can the connection be serviced” with the named project parties. Record the answer under the relevant opening or room reference so a later site, material or programme revision can be assessed against the correct approval.
Recording and verifying the decision
For power and cabling for motorised curtains, the approval record should identify the opening or room, current drawing revision, responsible party and date. Attach the dimensions, samples or system information needed to evidence “Was the cable tested before ceiling closure”; mark superseded decisions explicitly rather than relying on verbal instruction.
The release checklist for this guide is: Is the motor model confirmed; Is the supply verified in manufacturer data; Is the motor side correct; Can the connection be serviced; Was the cable tested before ceiling closure. Any unanswered point remains an action with a named owner and decision date, not an assumed instruction to proceed with production or installation.
Project checklist
Points to resolve in the project
- Is the motor model confirmed?
- Is the supply verified in manufacturer data?
- Is the motor side correct?
- Can the connection be serviced?
- Was the cable tested before ceiling closure?