Professional project guide
Selecting Motorised Window Treatments for a Project
Select a motorised window treatment from the opening dimensions, fabric load, operating frequency, power provision and control scenario—not convenience alone. Confirm motor and track capacity from current manufacturer data.Why it matters at project stage
An early system decision allows the motor side, curtain pocket, power supply and any control interface to be coordinated with the architectural finishes. A late decision may require visible cabling or revised access.
Information required
Establish the opening and load, operating frequency, power arrangement, motor side, control groups, service access and any manufacturer-supported control integration.
Reaching a project decision
Determine movement and load requirements before choosing power and control. Where noise, speed or integration matters, compare only documented compatible options.
Coordination through delivery
The curtain specialist defines the opening and motor requirements, the electrical team confirms supply, and the controls team confirms the interface. Record commissioning responsibility and test scenarios with the selection.
Project checklist
Points to resolve in the project
- Has motor capacity been verified?
- Is the power arrangement defined?
- Is the motor side marked?
- Are control groups documented?
- Is service access available?
Project consultation
