Selecting Motorised Window Treatments for a Project

Select a motorised window treatment from the opening dimensions, fabric load, operating frequency, power provision and control scenario—not convenience alone. Confirm motor and track capacity from current manufacturer data.
01

Why it matters at project stage

An early system decision allows the motor side, curtain pocket, power supply and any control interface to be coordinated with the architectural finishes. A late decision may require visible cabling or revised access.

02

Information required

Establish the opening and load, operating frequency, power arrangement, motor side, control groups, service access and any manufacturer-supported control integration.

03

Reaching a project decision

Determine movement and load requirements before choosing power and control. Where noise, speed or integration matters, compare only documented compatible options.

04

Coordination through delivery

The curtain specialist defines the opening and motor requirements, the electrical team confirms supply, and the controls team confirms the interface. Record commissioning responsibility and test scenarios with the selection.

Project checklist

Points to resolve in the project

  • Has motor capacity been verified?
  • Is the power arrangement defined?
  • Is the motor side marked?
  • Are control groups documented?
  • Is service access available?